Smart Meters

The innovation in electric energy management

Communication of readings
If you have not yet received a communication from E-REDES confirming that your electricity consumption is being automatically registered, we advise you to continue sending meter readings periodically.
Frequently Asked Questions
  1. The installation of smart meters is part of the mission of E-REDES, as the Distribution Network Operator, responsible for providing a public service of excellence, focused on the customer and promoting energy transition.

    The new meters have a more advanced technology that allows us to increase the quality of the service we provide you, such as the remote collection of readings automatically. In addition, we have strengthened environmental sustainability and energy efficiency.

  2. E-REDES has an updated plan for the installation of smart meters, which can be consulted here.

    If you have a connection in Normal Low Voltage (BTN), find out if your installation is covered by the meter replacement campaign for the next 12 months.

    This consultation can be made through our Chatbot, available at the bottom right of the page, by selecting the options “Meter / Meter Replacement”. You must have with you the Delivery Point Code (CPE) for your installation.

  3. Yes. E-REDES informs customers in advance about the expected period for the installation of the smart meter.

    If you want to know if your installation is covered by the campaign for replacing electricity meters in the next 12 months, the query can be made through our chatbot, available at the bottom right of the page, by selecting the options “Meter / Meter Replacement”. You must have with you the Delivery Point Code (CPE) for your installation.

  4. No. E-REDES, as the Distribution Network Operator, is responsible for installing, replacing, operating and maintaining the smart meter, as well as informing the customer about its use. 

  5. The data collected by the smart meters are processed by E-REDES, with due safeguard of the fundamental rights of the data subject.  

    They are used exclusively to ensure compliance with legal obligations and the legitimate interests of E-REDES, only for the period of time strictly necessary for the purposes of processing and with certain and determinable retention periods. 

    For more information on how E-REDES handles and protects personal data, you may consult the General Information Note on Data Processing, available on the E-REDES website under privacy.

  6. When this feature is active, you will receive a communication from E-REDES with this information. Until then, we advise you to continue sending meter readings periodically.

  7. The installation of smart meters is supported by E-REDES, as the Distribution Network Operator, and, as such, does not require the payment of any monetary amount. The smart meter is only charged in individual cases, when the infrastructure of the consumption location and its surroundings is not planned for the following 12 months.

  8. Yes. The activation or deactivation of the electric power supply, where it is not necessary for a technician to travel to the location, can be done remotely.

    The service must be carried out within a maximum of 24 hours from the moment the request is received by the energy supplier, if the customer has not indicated a preferred date, or from the time and date previously indicated. In an emergency situation, the service must be performed within a maximum of 3 hours from the moment the request is received by the energy supplier.

    If it is impossible to perform the service remotely within the maximum time limits, the customer will be informed by E-REDES or by their supplier within 24 hours, so that a visit to their consumption location can be scheduled.

  9. The request to change the contracted power must be made to your energy supplier, who, in turn, will request the execution of this service from E-REDES. 

    Once you receive a communication from E-REDES informing you that the meter is integrated in a smart Network, the service will be executed remotely, without the need for any technical visit. 

    In the case of changing the number of phases of the installation (example: Single-phase to Three-phase), all contractual changes are made in person in the field.

  10. To grant third parties access to your energy data, you will need to access the Balcão Digital [Digital Counter] and follow the steps in the procedure here.